
We UNION largely produce 6Ton to 50Ton amphibious excavator. In accordance to your requests, we could assemble diverse manufacturers and design excavator higher parts, like PC200, HITACHI ZX210, DH215, EX120,CAT315…. Also, if you have crawler excavator (New or Used) , we can only make amphibious undercarriage (Pontoon Undercarriage) for you. CZPTly would like could have possibilities to do businss with you and welcome you to pay a visit to our manufacturing facility!
UNION AMPHIBIOUS EXCAVATOR COULD BE Utilized TO DO
1.Deepening of canal, river channel and river mouth
2.Swamp land clearing at mining location, plantation and forest
three.Developing bund for flood prevention and land reclamation
4.Creating bund wall for fish and shimp ponds and salt creating market
5.Sludge clearing of lakes, ponds and water reservoir
six.Digging trenches for oil and fuel piping installation
seven.Transporting and clearing landslide and flood hit spot
eight.Swamps and wetlands building
nine.Street development by way of wetlands.
SPECIFICATION OF UCM210FT (KOMATSU PC210-seven Top PART )
| Engine | Engine model | DOOSAN DE08TIS |
| Gas | Diesel | |
| Number of Cylinders | 6 | |
| Number of strokes | 4 | |
| Piston Displacement | eight.07 Ltr | |
| Power | 110Kw (150PS) / 1950rpm | |
| Turbo charged | Of course | |
| Water-cooled | Indeed | |
| Fuel tank | 350L | |
| CZPT System | Flow rate of pump | 2 X 211 L / min |
| Circuit of working devices | 33000KP | |
| Circuit of walking | 33000KP | |
| Circuit of turning | 28000KP | |
| Swing speed | twelve.4 rpm | |
| CZPT pump | KAWASAKI | |
| Control valve | TONG MYUNG | |
| Swing motor model | TONG MYUNG | |
| Travel motor model | DOOSAN | |
| Operate Data | Operating Weight | 33000KG |
| Maximum Tractive effort | 205KN | |
| Arm / Boom | KOMAUS PC200-seven original arm | |
| Bucket capacity | .9M3 |
| Dimensions ( UCM210FT ) | mm | |
| A | Track length | 9000 |
| B | Ground contact length of tracks | 5200 |
| C | Tail swing radius | 2750 |
| D | Overall length | 11200 |
| E | Overall height (to the top of arm) | 3880 |
| F | Ground clearance of counter weight | 2571 |
| H | Overall width | 4940 |
| I | Track gauge | 3440 |
| J | Track width | 1500 |
| K | Ground clearance | 1140 |
| L | Track height | 1840 |
| M | Overall height (to the top of cab) | 3870 |
| N | Width of the top part | 2710 |
Details of manufacture
Packing and delivery
FAQ
Q: How to set up ?
A: 1., a floating box landing, the two via the tube into the floating box hole, inserted in the aspect of the tube, a piece of wooden pad, so that the lateral tilt
two. fall another pontoon and level it by means of two tubes
three. soon after the tube is inserted, the tube is set by the bolt
four.. Enlarge the plate to the tank and use the U card to fix it
five., the higher element of the excavator hoist, set on the market, with broad eyes on the Qi, tighten the screws
six. connect the hydraulic oil pipe, link the oil pipe of the motor on the float box to the excavator
Q:How to work?
A : 1., prohibit the procedure of a lot more than one.six meters h2o depth, silt is not constrained to depth
two., prohibited in the uneven, the left and proper sides of the floating box, the concentrate of wonderful disparity in the scenario, walking functions
3. amphibious excavators use sluggish gear whilst going for walks, and do not use quickly gear
four., begin the going for walks condition, the very first action on the foot of the throttle, and then wander
5. do not press tough objects even though walking
six. stay away from prolonged walking on the tough surface
seven. when turning, the entrance of the floating body can be lifted by the power of the bucket, and when the angle is shifted, the operating of the chain plate can be prevented, and the derailment of the chain plate can be prevented
Q: How to sustain?
A:1. make certain the chain pressure, unfastened situation must be altered to 3-five, a chain wheel suspension track shall prevail
2. make certain that the seat four screws, and make sure ten days (or function eighty several hours) to defeat the butter
three. leading silk, defeat butter when a 7 days
Check out the screws amongst the 4. chains and the chain, verify the screws usually and preserve the screws tight
