
Large Strenhtg G80 Lifting Chain:
Size: 6mm-42mm
Substance: Alloy metal, substantial tensile, heat dealt with.
Area treatment: Galvanized, Black painted, Self shade, Sprucing, Powder coated
Coloration: Self coloration, Red , gray, environmentally friendly, as to your ask for
Software: Ship, iron and metal sector, petroleum chemical sector, coal mine
CZPT Specification( Load chain):
| Dimensions(mm) | Min inside width | Max outside width | Bodyweight(kg/m) | working load(KN) | test load(KN) | test load(KN) |
| 6*eighteen | seven.five | 21 | .seventy nine | 11 | 27 | 45.2 |
| 7*21 | nine | 24.5 | 1.07 | fifteen | 37 | sixty one.6 |
| 8*24 | ten | 28 | one.38 | twenty | forty eight | eighty.4 |
| 9*27 | 11.five | thirty | 1.nine | 24.5 | sixty one | 102 |
| 10*30 | 12.five | 35 | two.2 | 32 | seventy six | one hundred twenty five |
| twelve*36 | fifteen.five | 42.2 | 3.three | 49 | 117 | 196 |
| thirteen*39 | sixteen.three | forty six | three.eight | 50 | 128 | 214 |
| fourteen*42 | eighteen | 49 | 4.thirteen | sixty three | a hundred and fifty | 250 |
| sixteen*48 | 20 | 56 | 5.sixty three | 80 | 192 | 320 |
| eighteen*54 | 23 | 63 | six.85 | one hundred | 246 | 410 |
| 20*sixty | twenty five | 70 | 8.6 | a hundred twenty five | 300 | five hundred |
| 22*66 | 28 | seventy seven | ten.five | 153 | 366 | 610 |
| 24*seventy two | 32 | eighty two | 12.seventy eight | a hundred and eighty | 432 | 720 |
| 26*seventy eight | 35 | ninety one | fourteen.87 | 213 | 510 | 650 |
| thirty*ninety | 38 | 105 | 19.six | 283 | 678 | 1130 |
| 32*96 | 40 | 106 | 22.29 | 322 | 772 | 1289 |
| 34*102 | forty six.five | 121.five | 25.5 | 363 | 870 | 1450 |
| 36*108 | forty nine.five | 128.5 | 31 | 407 | 978 | 1630 |
| 38*114 | fifty two | 136 | 32 | 453 | 1086 | 1810 |
| forty two*126 | 55.five | a hundred and forty four.5 | 38.6 | 554 | 1332 | 2200 |
Packaging & Supply:
Packing information:
Bulk packing
Packed in wooden instances
Packed in Iron drum, then in pallets
In accordance to your requirements
Supply Element: Normally 30 days soon after receiving your irrevocable L/C or advance payment.
